iPhone 6/6S Curved Glass Screen Protector - Black
iPhone 6/6S Curved Glass Screen Protector - Black
NZ Post estimate: Get it
-
Couldn't load pickup availability
Click Here for Screen Protector Installation Guide
This 3D curve fit screen protector is specially design for iPhone 6 and iPhone 6S.
Package includes:
- 1x iPhone 6S Glass Screen Protector
- 1x Microfibre cleaning cloth
- 1x Alcohol prep pad
- 1x Eco card box
- 1x Dust remover stickers
(Phone is not included)
Compatibility: iPhone 6, iPhone 6S
Please Note: Some larger thicker cases may not work well with the glass screen protectors due to the screen becoming thicker with the Glass screen protector. (Please see other listing for case friendly version)
Features:
HD Clarity – The Glass Screen Protector preserves Touchscreen Vibrancy, Sharpness and Clarity
Clear coating – This Glass Screen Protector combats against Scratches, Fingerprints and Oil
4 Layers - Explosion-Proof Film, Silicon Coating, Tempered Glass, Nano Structured Coating combine into one Glass Screen Protector
Reative – Retains touchscreen responsiveness through the Glass Screen Protector
0.45mm thickness - for best balance of Thickness, Flexibility and Hardness
Smooth edges - 5D Full edge design; which means this Glass Screen Protector will add to the Aesthetics of the phone
Premium adhesive– 3 Times stronger than a standard Glass Screen Protector
Anti-shatter – Fortified to avoid splinters, scratches and shatters
9H hardness- Strong, flexible glass – the best Glass Screen Protector rating you can get
